Solar street lighting installed along the route in Curicó, Chile. A clean off-grid installation with no trenching and no grid connection required.
- Solar luminaires for the Curicó route
- Clean off-grid installation
Project Gallery
Frequently asked questions
How many luminaires does a route like this take, and at what wattage?+
A kilometre at 6–8 m mounting height takes roughly 30 to 40 poles at 30–60 W, depending on the carriageway width and the spacing the road authority accepts. The order quantity for this route is the customer's figure; the specification behind it is the pole schedule we return with the DIALux study.
Curicó has dry summers and wet winters — what does that change?+
It moves the design month to winter, not summer: shorter days and more cloud decide the panel and the pack, not the brightest week of January. The -20 to +65 °C rating covers both ends of the year, and because nothing is trenched, the installation needs no road closure and no cable to fault-find in the wet season.
Your Project Could Be Next
Tell us your site conditions and target — our engineers will propose a lighting solution and, for solar projects, a free DIALux simulation.
Discuss Your Project