Claro Arena Stadium Inauguration-The most modern stadium in South America

Projects · By Wei Lin · 2025-08-27
Claro Arena Stadium Inauguration-The most modern stadium in South America

A stadium opening is a lighting deadline: the pitch, the access road and the service areas all have to be finished on the same day. For Claro Arena in Chile, our part was the street and service-road lighting — 300 W luminaires on poles that had to arrive before the inauguration, not after it.

Our 300W luminaires are installed along Manuel Vélez Main Street and service roads.

We are delighted that our lighting fixtures have contributed to this.

https://www.emol.com/noticias/Deportes/2025/08/23/1175878/universidadcatolica-claro-arena-inauguracion-imagenes.html

The load math is worth doing even on a road package. A 300 W luminaire running 12 hours a night draws 3.6 kWh; 100 of them draw 360 kWh a night, or 131 MWh a year. That is why driver efficiency and the dimming schedule matter as much as the lumen output on the datasheet.

FAQ

What was supplied for Claro Arena? 300 W luminaires, installed along Manuel Vélez Main Street and the service roads around the stadium in southern Chile — the installation the article credits with contributing to the inauguration.

Where can I read the original coverage? The article links to Emol's photo report on the Universidad Católica–Claro Arena inauguration, published 23 August 2025, which is the source for the images and the context.

Need Help With Your Lighting Project?

Our 25-engineer team provides free project consultation and fast, accurate quotations.

Get a Quote
← Back to All Articles